MPX 1 A product renderingThe Ask:

UK-based photonic measurement equipment manufacturer – Arden Photonics – approached explic8 for guidance and expertise on the implementation of the Material Resource Planning (MRP) software ‘MRPeasy’, to transition their business away from Excel-based planning and stock control. The business already had in-place a highly effective CRM and Financial system and was looking for an intermediary platform to provide insight deeper control into their production operations.

 

The Challenges:

  • The organisation was conducting their production planning with success utilising excel-based models
  • The business had run their material requirements with a manual kanban system that required siloed knowledge to process with suppliers efficiently
  • The organisation had experienced year-on-year growth, with an expanding product range leading to a growing number of parts, and controlled engineering documents for production
  • The organisation did not have full visibility into shopfloor production labour utilisation
  • The organisation needed a platform that could help estimate production costing, with the ability to review variance costing against actuals

The Objectives:

  • Implement the cloud-based MRP system ‘MRPeasy’ with shop floor reporting and full production scheduling capabilities.
  • Migrate over the controlled documents for bill of materials and routings from engineering with assurance for continued control moving forward
  • Provide visibility of live stock-control, allowing the system to prompt, and guide the purchasing requirements to reduce the need for stock holding and therefore value of stock on-hand
  • Provide the organisation with enriched operational data to continue to make data-driven decisions on the performance of the business
  • Build digital workflows that allow data to synchronise from the CRM and into the Financial Package in use

The Approach:

  • 9-week project centred around system capability, data gathering and analysis, system set-up and workflow development, through to training and Go-Live
  • 83 business requirements identified for consideration with the implementation of the new ‘MRPeasy’ system, of which, 90%+ could be satisfied by the platform
  • Current state processes mapped using the ‘Brown Paper’ technique, looking at the business through the lens of Forecast, Planning, Action and Reporting
  • Future state processes developed with the internal team, including simulated running of the new processes in a sandbox environment
  • Development of ‘MRPeasy’ internal superuser capabilities
  • Go-Live planning, and monitoring of the system to develop internal problem-solving and solution creation inside ‘MRPeasy’

The Result & Benefits

  • Centralised cloud-based software allowing access to production planning, inventory and procurement management
  • Increase in accuracy of stock control through implementation of shop floor reporting at the point of usage
  • Production planning capabilities that take into consideration material availability and production capacity
  • Single-source of truth for their production BOMs and parts register managed by their internal engineering team
  • Production traceability through serial number allocation to both finished goods and internal components allowing insight from purchase to shipment

global businessThe Ask:

  • How do we introduce and standardise a global Integrated Business Planning Process?
  • Need to expand focus and integration of new, growing, strategic market.
  • Focus on Innovation and Technology and global process step integration.

  

Challenges:

  • The monthly IBP process had traditionally been driven by demand from the Americas and did not include EMEA or Asia-Pacific demand
  • There was ineffective integration of data from a new and developing global market. This led to poor forecasting of customer demand, raw materials, capacity, and labour, as well as reactivity and fire-fighting, opposed to proactivity
  • Coupled with poor data integration, the business IBP cycle had become routine, “data heavy” and suffered from team members “going through the motions”
  • The initial IBP process was more than 15 years old, and data complexity, accuracy and integrity had degraded over time
  • The traditional, base business dominated the process. Stronger integration of the new growing market needed to be undertaken to facilitate strategic execution
  • Strategic growth in a new global market would challenge global capacity. An upgraded IBP process was critical to forecast when investment was needed to deliver increased capacity; especially with commissioning lead times of 12-18 months

The Approach:

  • Assembled a design team with leaders of each process step within the IBP process
  • Comprehensive evaluation of current state – Process, Data, Organisation, Inputs/Outputs
  • Education related to the evolution of S&OP into IBP and the importance of scenario planning
  • Analysis of data inputs and outputs to evaluate if data complexity could be reduced Innovation, Project Mgr. and Portfolio Mgt.? Where to meet the customer? Planning materials for demand forecasts? Strategic Material Supply? Inventory Planning? Financial Forecasting?
  • Process mapping for current state and future state and identification of process change using IDEF0 and Kaizen principles
  • Requirement to build standardised process – data, people, process steps and presentations

The Achievements

  • Complete process redesign which included standardised process, input and output templates, RACI associated with each process step and significantly reduced cycle process time
  • An IBP process which acted as a conduit between short- and long–term horizons
  • An upgraded process that provided better focus and integration of an important market that will drive strategic growth
  • Improved Product Management Review process that was now capable of managing NPD through to product launch and understanding its impact on market share and portfolio management
  • Enhanced integration to deliver capacity scenarios and investment requirements that were driven by global market growth and market share expansion forecasts
  • An IBP process cycle that was reduced from 28 days to 5 days which had a significant impact on process data integrity
  • A focus of “Learn by doing” understanding that forecast data is inherently lacking in accuracy, but the team would constantly strive for data accuracy improvements

The Ask

As part of its diversification strategy to combat sales erosion from drugs facing cheap generic competition, a global pharmaceutical company acquired two subsidiary companies – one is a vaccines company, the other is a biotech company.

Each was left to run autonomously for a number of years until the Chief Medical Officer challenged why there wasn’t one drug safety system instead of three.

The parent company and the two acquisitions each had their own drug safety systems supported by different organizational structures, different processes and procedures, different IT systems operating in different geographical locations.

This project was designed to simplify and harmonize the client’s end to end PV business processes into a single process and to integrate the subsidiaries into the parent PV, regulatory and quality departments.

Objectives

  • To meet corporate capabilities;
  • To meet the needs of affiliates;
  • To comply with all current and upcoming regulations;
  • To adopt pharmaceutical industry best practices;
  • To improve efficiency;
  • To reduce cost; and
  • To take advantage of advancements in technology.

Challenges

  • How to reorganize three Pharmacovigilance departments into one;
  • Resources we defensive about their jobs, processes and technologies;
  • How to develop one process workflow that met the needs of three different companies;
  • How to integrate three different product families into one safety database;
  • How to train resources to be competent and proficient in the use of new processes, procedures and systems; and
  • How to comply with regulations in three different countries.

Implications

  • None of the three databases could accommodate all of the products from all three companies;
  • Regulations differed country to country;
  • Following the creation of one PV department there may be over staffing as a result.

The Approach

Initially, work was conducted separately with the staff in each company to understand the specific requirements and nuances of their operations pertinent to the type of company and its product families:

  • Mapping the client’s current “As-Is” processes;
  • Design and development of the re-engineered “To-Be” processes;
  • Workshop organization and facilitation;

The process maps were compared to identify commonality and gaps and used to determine best practice.

A data analysis was undertaken in each of the drug safety systems to identify commonality and gaps to determine what changes might need to be made at field level to accommodate the product types.

Then a systems analysis was completed to see which, if any, of the three drug safety systems could accommodate all product types.

An integration road map and time-table was developed and deployed.

The implementation project encompassed a PMO and 15 different project teams.

Results and benefits

  • Three Pharmacovigilance departments were reorganized into one;
  • One process workflow was developed that met the needs of three different companies;
  • Three different product families were integrated into one safety database;
  • The new drug safety system complied with regulations in each country;
  • Pharmaceutical industry best practices were adopted;
  • Efficiency and productivity improved;
  • Costs reduced; and
  • An updated IT system took advantage of advancements in technology.

Background

Between 2016 and 2020, on-line shopping saw significant growth, driven by factors such as increased internet penetration, improved technology, changing consumer behaviour, and the convenience of e-commerce.

The global e-commerce market experienced robust growth, with many consumers shifting towards on-line shopping for a wide range of products and services.
omnichannel

Various reports and studies indicated that the annual growth rate of on-line shopping during this period ranged from around 15% to 25% globally, with some regions experiencing even higher growth rates.

The COVID-19 pandemic in 2020 further accelerated the shift to on-line shopping, as lockdowns and social distancing measures forced more consumers to shop on-line rather than in physical stores.

The COVID-19 pandemic continued to have a lasting impact on consumer behaviour, accelerating the growth of e-commerce and on-line shopping even further in the period 2020 and 2024.

Many traditional brick-and-mortar retailers invested heavily in their on-line platforms and digital capabilities to meet the increasing demand for on-line shopping.

With the increasing adoption of mobile shopping, social commerce, and other on-line shopping trends, the e-commerce landscape is evolving rapidly, requiring support from improved logistics, enhanced customer experiences, and the rise of omnichannel retailing.

 

The Ask:

A renowned global brand wanted to become a formidable omnichannel player, catering seamlessly to its retail stores, wholesale outlets, and e-commerce clientele. Fuelled by robust historical growth, the brand decided to embark on a transformative journey to revamp its entire supply chain and collaborate across cross-functional teams in crafting a future-proof omnichannel strategy.

The Approach

The brand initiated an in-depth market exploration, encompassing customer interviews, store immersions, and competitive assessments to grasp the evolving expectations of omnichannel consumers regarding shopping experiences and delivery services.  Distinct customer segments were identified and aligned with tailored services and delivery timelines.  Subsequently, the brand delineated a supply chain framework tailored to cater to these customer segments effectively.

The Challenges:

  • Existing infrastructure and partnerships;
  • Traditional fulfilment methods, such as centralised and decentralised warehouse shipments;
  • A mix of customised solutions per location;
  • Proximity to or distance from customers;
  • Swift retail store replenishment;
  • Warehouse capacity.

Results and Benefits

An agile implementation roadmap was meticulously developed to facilitate rapid testing and learning cycles.  Each component underwent swift piloting and evaluation to ascertain the scalability and efficacy of fulfilment options, enabling prompt decisions on scaling or discarding solutions from the roadmap.

The success of this project lay in transcending mere modelling and quantitative analysis, as a cross-functional team diligently ensured the holistic consideration of all pertinent factors:

  • Marketing championed the prioritisation of customer expectations;
  • The supply chain team scrutinised the operational viability of fulfilment strategies;
  • The logistics team rigorously evaluated transportation costs; and
  • The commercial team expanded the collaborative partner ecosystem.

The result was that the brand achieved THE simple, yet challenging, central requirement for same-day delivery – a dense network of warehouses that stock the same assortment and are able to move it from click-to-ship in two hours or less to cover all tier-1 and tier-2 cities incorporating innovative fulfilment approaches like shipping from dark stores, retail outlets, or temporary nodes and forging a collaboration with a partner e-tailer possessing surplus warehouse capacity.

pharmaThe Ask:

A global pharmaceutical company had seen its conversion costs of tabletted products rise by approximately 45% over the previous three years. The high cost structure was a result of broken processes, excess effort and unnecessary complexity. The goal was to reduce the cost of conversion by 25%.

Objectives

  • To identify and understand the real cost drivers;
  • To improve the manufacturing capability, capacity and performance;
  • Assure conformance and compliance are aligned;
  • To protect the brand;
  • To maintain the lowest cost structure possible; and
  • To reduce the cost of conversion by 25%.

The Approach

The approach used was to:

  • Conduct an Operational Assessment
  • Construct process maps of:
    • the procurement process;
    • the local planning and scheduling processes;
    • the demand assessment process;
    • the batch record process; and
    • the production processes and key sub processes.
  • Conduct a LEAN operating model review using benchmarking against industry best practise looking at:
    • downtime;
    • changeovers;
    • reject products
    • material flow;
    • capacity utilisation; and
    • raw material supply.

The output was a quantification of non-value-adding versus value-adding activities and to demonstrate the compelling case to alter the conformance standards to further reduce cost.

The Toolkit

  • Process mapping tools;
  • Interviews with key staff;
  • Lean operational review;
  • Benchmarking;
  • Introduction of KPIs;
  • Quantification of NVA/VA activities;
  • Quality standards review;
  • Assessment of performance improvement potential; and
  • Outline project plans to realise benefits.

The Challenges:

  • Customer service reliability had fallen from the previous year;
  • First time quality was decreasing while adhering to high conformance standards;
  • Customer complaints had increased;
  • Manufacturing lead times were longer than necessary and were failing to meet Customer Demand Times;
  • Failures in raw materials supply regularly shut down manufacturing despite the company maintaining high levels of inventory.

Implications

  • Market share was not achieving the expected growth; and
  • Profitability had fallen.

Results and Benefits

The manufacturing processes and the manufacturing support processes were leaned-out and the correct level of compliance conformance for the product families was agreed;
A new scheduling methodology was implemented after the raw material constraint was released to provide a smooth flow of material based upon consumption to Takt time;

  • Direct labour cost was reduced by 57%;
  • Total salaries and wages were reduced by 55%;
  • Net allocations were reduced by 34%;
  • 72% reduction in lead time;
  • 39% reduction in working days per year;
  • 33% reduction of conversion cost.

pharma 2The Ask:

A global pharmaceutical company wanted to develop a QMS narrative document to outline the vision for a business-oriented quality management system, that actively supports the competitiveness of a modern pharmaceutical company in a rapidly changing healthcare environment and which would maintain regulatory compliance in all markets.  explic8 was asked to develop solutions to the following questions:

  • How do we create a rapid transition from traditional pharma product development to innovative and integrated healthcare solutions with expertise, processes and governance structures which are ideally suited to support complex projects?
  • What are the implications for leadership, structure, governance, and team composition to build mutual understanding and effective execution?

Results and Benefits

The novel QMS framework that was developed is characterized by two key statements:

  • The QMS contains three axes – People, Process, and Programs and provides a clear and stable structure, and the realignment and optimization of Teams, Plans, and Roles within it creates a dynamic environment that is agile and governable;
  • The emphasis on Teams, Plans, and Roles allows the execution of programs of all degrees of complexity and innovation, each with its own ‘sweet spot’ in the framework, to supporting maximum agility without being at risk of leaving the protective boundaries of the QMS.

The stakeholders agreed that the framework is a viable Transformation Framework for a successful PD transformation, to achieve the client’s vision.

Challenges:

  • The company produces pharmaceutical products, delivery devices, diagnostic services and Patient Health Care devices;
  • Each of these is governed by different sets of regulations and ICH guidelines;
  • It is extremely difficult to embrace all of these governance structures into one QMS;
  • The senior stakeholders were in disagreement over the structure that the new QMS should take;
  • There were serious concerns about:
  • the governance of such a complex model;
  • whether innovative development projects could remain compliant within the QMS; and
  • The company’s capability to adapt to the change.

Implications

  • Risk of non-compliance
  • Threat to market position if the transformation is not successful.

Objectives

  • Develop a novel QMS approach that is agile, governable and supports the successful execution of innovative projects, whilst providing a stable framework that ensures the protective boundaries of a QMS would not be exceeded.

The Approach:

The project was proposed as a four-week effort by an explic8 senior consultant and a QMS consultant over a six-week period, with the following four phases:

  • Preparation phase: where explic8 understands the context of the QMS narrative effort and prepares 5-10 key stakeholders for their role in the project;
  • Interview phase: where explic8 engages said stakeholders to understand their requirements, expectations and potential concerns about the business-oriented quality management approach that should be reflected in the QMS narrative;
  • Analysis and consensus phase: where explic8 summarises and characterises the superset of requirements, expectations and concerns and drives consensus in the stakeholder group;
  • Closing phase: where explic8 redrafts the QMS narrative based on achieved consensus for adoption with final review, adoption by the stakeholder group and collective closeout meeting.